External Project Manager
Prishtina Mall is seeking to engage an experienced and highly qualified External Project Manager to act as the Owner’s independent technical representative for a major rooftop Solar Photovoltaic (PV) installation project.
The project involves the design, supply, installation, testing and commissioning of a photovoltaic power plant with an estimated installed capacity of approximately 3.0 MWp to 3.5 MWp. The engagement will provide independent technical oversight, coordination and monitoring throughout the project lifecycle, with a focus on protecting the Owner’s interests and ensuring compliance with contractual, technical, safety, legal and operational requirements.
1. Project Background
The Owner has awarded an EPC/installation contract covering the design, supply, installation, testing and commissioning of a photovoltaic power plant with an installed capacity of approximately 3.0 MWp to 3.5 MWp.
In parallel, the Owner has engaged an independent Fire Safety Consultant to carry out a fire risk assessment and define the specific fire protection and life safety requirements applicable to the photovoltaic installation.
The External Project Manager (PM) will act as the Owner’s technical representative and Owner’s Engineer, ensuring the review, validation, coordination and oversight of all stakeholders involved in the project. These stakeholders include the EPC Contractor, specialist companies, project offices, the Fire Safety Consultant, local authorities, utility companies, insurers and the Shopping Centre’s operational teams.
The PM will support the delivery of the project in accordance with contractual, technical, safety, legal and operational requirements, while safeguarding the Owner’s interests throughout the project lifecycle.
2. Project Objectives
The External Project Manager will be responsible for:
- Representing the Owner in all technical and project-related matters.
- Coordinating interfaces and activities between all parties involved in the project.
- Reviewing and validating technical deliverables submitted by the EPC Contractor.
- Monitoring compliance with fire safety requirements and applicable legislation.
- Monitoring compliance with the approved project documentation and all requirements set out in the Terms of Reference.
- Ensuring that the photovoltaic installation is compatible with the Shopping Centre’s operational and maintenance requirements.
- Monitoring the project schedule, risks, quality, and health and safety performance.
- Monitoring EPC documentation and ensuring the timely renewal of critical paperwork, insurance policies and guarantees.
- Tracking and recording non-compliance and calculating applicable Liquidated Damages, where relevant.
- Overseeing testing, commissioning, handover and final acceptance.
3. Scope of Services
3.1 Design and Technical Review
Coordinate the review and assessment of all technical documentation submitted by the EPC Contractor, including, but not limited to, the following:
3.1.1 Electrical Design
- Single-line diagrams.
- Detailed electrical design.
- Protection coordination studies.
- Short-circuit studies.
- Load flow studies.
- Earthing and lightning protection systems.
- Arc-flash assessments, where applicable.
- Power quality studies.
- Grid connection documentation.
- Energy metering and monitoring systems.
- SCADA and remote monitoring architecture.
3.1.2 Structural Design
Coordinate the review and assessment of the structural documentation prepared by the Contractor, including:
- Roof load capacity studies.
- Structural calculations.
- Wind load calculations.
- Seismic assessments, if applicable.
- Mounting system calculations.
- Fixing methodologies.
- Waterproofing and roof integrity provisions.
- Compatibility with existing building structures.
The PM will coordinate an independent structural review by a qualified structural engineer whenever considered necessary.
3.1.3 Equipment Review
Coordinate the review of technical specifications and compliance documentation for the following equipment and systems:
- PV modules.
- Inverters.
- Mounting structures.
- DC and AC cabling.
- Switchgear.
- Protection devices.
- Transformers.
- Monitoring and control systems.
- Safety equipment.
3.2 Fire Safety Compliance
Coordinate the verification of compliance with the Fire Risk Assessment and all requirements established by the Fire Safety Consultant, including:
- Fire compartmentation requirements.
- Access routes for firefighters.
- Safety clearances.
- Emergency shutdown systems.
- Firefighter isolation switches.
- Smoke extraction interfaces.
- Signage and labelling requirements.
- Cable routing requirements.
- Fire detection and alarm interfaces.
- Insurer requirements.
3.3 Procurement Support
When requested by the Owner, provide support throughout procurement processes by:
- Identifying potential qualified vendors and specialist companies for specific disciplines.
- Clarifying technical questions raised by bidders, in coordination with the Owner and relevant stakeholders.
- Performing or supporting the technical evaluation of received offers.
For each procurement process, prepare a brief evaluation summary and recommendation for the Owner, identifying the preferred bidder(s) and highlighting key risks, gaps or relevant considerations.
3.4 Regulatory and Legal Compliance
Monitor and support compliance with all applicable regulations and permitting requirements, including:
- Building and construction regulations.
- Electrical regulations.
- Renewable energy regulations.
- Grid connection requirements.
- Occupational health and safety requirements.
- Fire safety regulations.
- Environmental requirements.
- Utility and network operator requirements.
Identify any permits, approvals or notifications required for the project and monitor their timely completion.
3.5 Project Coordination and Stakeholder Management
Act as the central coordination point between the following parties:
- EPC Contractor.
- Specialist companies.
- Project offices.
- Fire Safety Consultant.
- Shopping Centre Management.
- Operations and Maintenance Teams.
- Utility / Distribution Network Operator.
- Insurance representatives.
- Authorities Having Jurisdiction (AHJ).
Coordination responsibilities will include:
- Organising and chairing coordination meetings.
- Issuing meeting minutes.
- Managing project communications.
- Coordinating technical interfaces.
- Escalating critical issues.
- Monitoring action plans and agreed follow-up actions.
3.6 Schedule and Progress Monitoring
Review and monitor the following project planning and progress elements:
- Baseline schedule.
- Detailed execution programme.
- Procurement schedule.
- Critical path activities.
- Key project milestones.
The PM will:
- Identify delays and execution risks.
- Assess proposed mitigation plans.
- Monitor recovery programmes.
- Report schedule performance and relevant deviations to the Owner.
3.7 Construction Oversight
Coordinate technical oversight during construction to help ensure compliance with approved designs and contractual requirements.
Activities will include:
- Regular site inspections.
- Quality audits.
- Technical compliance reviews.
- Verification of installation practices.
- Monitoring workmanship quality.
- Monitoring Contractor performance.
Specific attention will be given to:
- Roof works.
- Structural installations.
- Waterproofing integrity.
- Electrical installations.
- Interfaces with existing operational systems.
- Fire protection measures.
3.8 Health, Safety and Environmental Oversight
Monitor the implementation of the Contractor’s health, safety and environmental (HSE) requirements.
Review and assess the following:
- Construction Phase Safety Plan.
- Method Statements.
- Risk Assessments.
- Emergency Response Plans.
- Rescue Plans.
- Work-at-height procedures.
- Lock-Out/Tag-Out procedures.
- Lifting plans.
- Traffic management plans.
Special attention will be given to maintaining a safe environment within an operational shopping centre, taking into account the presence of employees, tenants, visitors, contractors and other site users.
3.9 Risk Management
Develop and maintain a Project Risk Register covering, at a minimum, the following categories and risks:
Technical Risks
- Structural overload.
- Roof damage.
- Waterproofing failures.
- Electrical faults.
- Arc-flash risks.
- Equipment failures.
Operational Risks
- Business interruption.
- Loss of electrical supply.
- Restricted access to technical plant.
- Maintenance constraints.
Safety Risks
- Fire.
- Electric shock.
- Falling objects.
- Work-at-height incidents.
Regulatory Risks
- Permit delays.
- Compliance failures.
- Utility approvals.
The PM will propose appropriate mitigation measures, assign or recommend follow-up actions as appropriate, and monitor their implementation.
3.10 Change Management
Review and assess all proposed changes submitted by the Contractor.
Each proposed change will be assessed, as applicable, in terms of:
- Technical implications.
- Safety implications.
- Fire safety implications.
- Cost impact.
- Programme impact.
- Operational impact.
Provide recommendations to the Owner before any proposed change is approved.
3.11 Testing and Commissioning
Review and witness the execution of the following activities, as applicable:
- Pre-commissioning inspections.
- Equipment testing.
- Protection testing.
- Functional testing.
- SCADA and monitoring testing.
- Emergency shutdown testing.
- Utility interconnection testing.
- Performance testing.
Review the Commissioning Plan and associated procedures and provide the required technical review and recommendations.
3.12 Handover and Provisional Acceptance
Support the Owner throughout the handover process by:
- Preparing punch lists.
- Identifying non-conformities.
- Verifying corrective actions.
- Reviewing completion documentation.
- Recommending Provisional Acceptance when the applicable requirements have been met.
3.13 Final Acceptance
Verify that:
- All punch-list items have been closed.
- Performance requirements have been achieved.
- Required documentation has been delivered.
- Training has been completed.
- Warranties have been transferred to the Owner.
Following verification, issue a recommendation to the Owner regarding Final Acceptance.
3.14 Documentation Review and Handover
Review and validate the final project documentation, including, but not limited to:
Technical Documentation
- As-built drawings.
- Updated calculations.
- Protection settings.
- Single-line diagrams.
- Equipment registers.
Operations Documentation
- O&M manuals.
- Preventive maintenance schedules.
- Recommended spare parts stock.
- Emergency procedures.
Compliance Documentation
- Inspection certificates.
- Regulatory approvals.
- Fire safety compliance certificates.
- Commissioning reports.
- Performance test reports.
Commercial Documentation
- Equipment warranties.
- Installation warranties.
- Performance guarantees.
4. Deliverables
The External Project Manager will provide, at a minimum, the following deliverables:
- Initial Design Review Report.
- Monthly Progress Reports.
- Monthly Risk Register Updates.
- Meeting Minutes.
- Site Visit Reports.
- Technical Review Reports.
- Fire Safety Compliance Reviews.
- Change Request Assessments.
- Commissioning Review Report.
- Provisional Acceptance Report.
- Final Acceptance Report.
- Final Project Close-Out Report.
5. Required Qualifications and Experience
Applicants must meet the following minimum requirements:
- University degree in Electrical, Energy or Mechanical Engineering.
- Minimum of 10 years of project management experience in solar energy projects.
- Experience managing at least one solar PV project with a capacity of 1 MWp or more within the last three years.
- Experience managing at least one rooftop solar PV installation with a capacity of 1 MWp or more.
Applicants should be able to demonstrate their relevant project experience through a clear record of completed or ongoing assignments, including project capacities, dates and their individual responsibilities.
6. Type and Duration of Engagement
- Contract Type: Service Agreement – Independent External Professional.
- Engagement: Fixed-term, project-based professional services.
- Duration: Estimated 30–35 weeks, subject to actual project completion. Until mechanical completion is achieved and the PV system has successfully passed the commissioning test.
- Location: Prishtina Mall, Prishtina, Kosovo.
- Independence: The selected professional will act independently as the Owner’s technical representative and will not become part of Prishtina Mall’s internal organisational structure or regular hierarchical reporting system.
This is an independent professional services engagement and does not constitute an employment relationship with Prishtina Mall.
7. Application Requirements
Interested professionals are invited to submit the following documents and information:
- Updated Curriculum Vitae (CV).
- Copies of academic qualifications and relevant professional certifications.
- List of relevant solar PV projects, including project capacity (MWp), project dates and the applicant’s responsibilities.
- Evidence of experience with rooftop solar PV installations of at least 1 MWp.
- Professional references, if available.
- Proposed professional fee for the complete scope of services, including the proposed payment structure and any additional costs.
8. How to Apply
Interested candidates are invited to submit their application, together with the requested supporting documentation, no later than 30.11.2026 to:
hr@prishtinamall.com
Please use the following subject line when submitting your application:
Application – External Project Manager (Solar PV Installation Project)
Only shortlisted candidates will be contacted.

